This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table S024 (Totals Records for Work Center) is a standard table in SAP ERP. It belongs to the package MCS.
Table | S024 |
Short Text | Totals Records for Work Center |
Package | MCS |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
SSOUR | ✔ | Statistic(s) origin | SSOUR | CHAR | 4 | |
VRSIO | ✔ | Version number in the information structure | VRSIO | CHAR | 3 | * |
SPMON | ✔ | Period to analyze - month | SPMON | NUMC | 6 | |
SPTAG | ✔ | Period to analyze - current date | SPTAG | DATS | 8 | |
SPWOC | ✔ | Period to analyze - week | SPWOC | NUMC | 6 | |
SPBUP | ✔ | Period to analyze - posting period | SPBUP | NUMC | 6 | |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
FEVOR | ✔ | Responsible planner group/department | VAGRP | CHAR | 3 | T024A |
ARBPL | ✔ | Work center | ARBPL | CHAR | 8 | |
PERIV | Fiscal Year Variant | PERIV | CHAR | 2 | T009 | |
VWDAT | Pointer to administrative data | VWDAT | NUMC | 10 | ||
LMEIN | Base Unit of Measure | LAGME | UNIT | 3 | T006 | |
DFZEH | Unit of measure for execution time | DFZEH | UNIT | 3 | ||
ANZFA | Number of production orders | MC_ANZFA | DEC | 9 | ||
S_DLZ | Target lead time | S_DLZ | QUAN | 7 | ||
I_DLZ | Actual lead time | I_DLZ | QUAN | 7 | ||
DLZAB | Deviation in lead time | DLZAB | QUAN | 7 | ||
S_DFZ | Target execution time | S_DFZ | QUAN | 7 | ||
I_DFZ | Actual execution time | I_DFZ | QUAN | 7 | ||
S_WTZ | Target queue time | S_WTZ | QUAN | 7 | ||
I_WTZ | Actual queue time | I_WTZ | QUAN | 7 | ||
WTZAB | Queue time deviation | WTZAB | QUAN | 7 | ||
Z_TAB | Deviation from scheduled input date | X_TAB | QUAN | 7 | ||
ZA_TAB | Schedule deviation: input date in relation to output date | DZA_TAB | QUAN | 7 | ||
A_TAB | Deviation in scheduled output date | A_TAB | QUAN | 7 | ||
R_TAB | Relative schedule deviation | R_TAB | QUAN | 7 | ||
GMNGA | Total Delivered Lot Size | MC_GMNGA | QUAN | 15 | ||
MGVRG | Operation quantity | MC_MGVRG | QUAN | 15 | ||
LMNGA | Total quantity confirmed | MC_LMNGA | QUAN | 15 | ||
ABWMG | Quantity Variance | ABWMG | QUAN | 15 | ||
ASVRG | Operation scrap | MC_ASVRG | QUAN | 15 | ||
XMNGA | Total scrap quantity confirmed | MC_XMNGA | QUAN | 15 | ||
ABWAS | Scrap Variance | ABWAS | QUAN | 15 | ||
KAPAN | Available capacity | MC_KAPAN | QUAN | 7 | ||
KSUMS | Total target capacity requirements | MC_KSUMS | QUAN | 7 | ||
KAPAZ | Capacity Load Utilization | MC_KAPAZ | DEC | 4 |