This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table S022 (SFIS: Order Operation Data for Work Center) is a standard table in SAP ERP. It belongs to the package MCS.
Table | S022 |
Short Text | SFIS: Order Operation Data for Work Center |
Package | MCS |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
SSOUR | ✔ | Statistic(s) origin | SSOUR | CHAR | 4 | |
VRSIO | ✔ | Version number in the information structure | VRSIO | CHAR | 3 | * |
SPMON | ✔ | Period to analyze - month | SPMON | NUMC | 6 | |
SPTAG | ✔ | Period to analyze - current date | SPTAG | DATS | 8 | |
SPWOC | ✔ | Period to analyze - week | SPWOC | NUMC | 6 | |
SPBUP | ✔ | Period to analyze - posting period | SPBUP | NUMC | 6 | |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
ARBPL | ✔ | Work center | ARBPL | CHAR | 8 | |
KAPAR | ✔ | Capacity category | KAPART | CHAR | 3 | TC26 |
MATNR | ✔ | Material Number | MATNR | CHAR | 18 | MARA |
AUFNR | ✔ | Order Number | AUFNR | CHAR | 12 | * |
PLNUM | ✔ | Planned order number | PLNUM | CHAR | 10 | * |
POSNR | ✔ | Order Item Number | CO_POSNR | NUMC | 4 | |
PLNFL | ✔ | Sequence | PLNFOLGE | CHAR | 6 | |
VORNR | ✔ | Operation/Activity Number | VORNR | CHAR | 4 | |
PERIV | Fiscal Year Variant | PERIV | CHAR | 2 | T009 | |
VWDAT | Pointer to administrative data | VWDAT | NUMC | 10 | ||
MEINH | Unit of Measure for Activity/Operation | VORME | UNIT | 3 | * | |
DFZEH | Unit of measure for execution time | DFZEH | UNIT | 3 | ||
LIGZE | Unit of measure for wait time | LIGZE | UNIT | 3 | ||
WRTZE | Unit of measure for queue time | WTRZE | UNIT | 3 | ||
RSTZE | Unit of measure for setup time | RSTZE | UNIT | 3 | ||
BEAZE | Unit of measure for processing time | BEAZE | UNIT | 3 | ||
ARUZE | Unit of measure for teardown | ARUZE | UNIT | 3 | ||
TRAZE | Unit of measure for move time | TRAZE | UNIT | 3 | ||
KEINH | Unit of of measure for displaying capacity requirements | CY_KEINH | UNIT | 3 | T006 | |
KAPID | Capacity ID | KAPID | NUMC | 8 | * | |
KALID | Factory Calendar | WFCID | CHAR | 2 | * | |
OBJNR | Object number | J_OBJNR | CHAR | 22 | * | |
VERTL | Distribution function for capacity requirements | VERTEILUNG | CHAR | 2 | * | |
ERDAT | Created on | AUFERFDAT | DATS | 8 | ||
FTRMP | Planned release date | CO_FTRMP | DATS | 8 | ||
FTRMS | Scheduled release date | CO_FTRMS | DATS | 8 | ||
FTRMI | Actual release date | CO_FTRMI | DATS | 8 | ||
GSTRP | Basic start date | CO_GSTRP | DATS | 8 | ||
GSTRS | Scheduled start | CO_GSTRS | DATS | 8 | ||
GSTRI | Actual start date | CO_GSTRI | DATS | 8 | ||
SSADD | Latest target input date | SSADD | DATS | 8 | ||
IADD | Actual input date | IADD | DATS | 8 | ||
FSAVD | Earliest scheduled start: Execution (date) | FSAVD | DATS | 8 | ||
SSAVD | Latest scheduled start: Execution (date) | SSAVD | DATS | 8 | ||
ISDD | Actual start: Execution (date) | ISDD | DATS | 8 | ||
ISAVD | Actual operation start (date) | ISAVD | DATS | 8 | ||
FSEDD | Earliest scheduled finish: Execution (date) | FSEDD | DATS | 8 | ||
SSEDD | Latest scheduled finish: Execution (date) | SSEDD | DATS | 8 | ||
IEDD | Actual finish: Execution (date) | IEDD | DATS | 8 | ||
IEAVD | Actual finish of operation (date) | IEAVD | DATS | 8 | ||
GLTRP | Basic finish date | CO_GLTRP | DATS | 8 | ||
GLTRS | Scheduled finish | CO_GLTRS | DATS | 8 | ||
GLTRI | Actual finish date | CO_GLTRI | DATS | 8 | ||
GMNGA | Confirmed yield in order unit of measure | GMNGA | QUAN | 13 | ||
MGVRG | Operation Quantity | MGVRG | QUAN | 13 | ||
LMNGA | Total Yield Confirmed | LMNGA | QUAN | 13 | ||
ASVRG | Operation scrap | ASVRG | QUAN | 13 | ||
XMNGA | Total scrap quantity confirmed | XMNGA | QUAN | 13 | ||
S_DFZ | Target execution time | S_DFZ | QUAN | 7 | ||
I_DFZ | Actual execution time | I_DFZ | QUAN | 7 | ||
LIEGZ | Wait time used for scheduling | MC_LIEGZ | QUAN | 7 | ||
WARTZ | Queue time used for scheduling | MC_WARTZ | QUAN | 7 | ||
RUEST | Scheduled setup time | MC_RUEST | QUAN | 7 | ||
BEARZ | Scheduled processing time | MC_BEARZ | QUAN | 7 | ||
ABRUE | Scheduled teardown time | MC_ABRUE | QUAN | 7 | ||
TRANZ | Move time used for scheduling | MC_TRANZ | QUAN | 7 | ||
KRUES | Scheduled cap. requirements for the op. segment "setup" | MC_KRUES | QUAN | 7 | ||
KBEAS | Scheduled cap. requirements for the op. segment "processing" | MC_KBEAS | QUAN | 7 | ||
KABRS | Scheduled cap. requirements for the op. segment teardown | MC_KABRS | QUAN | 7 | ||
LIEGV | Wait time used for scheduling | MC_LIEGZ | QUAN | 7 | ||
KAPKZ | SFIS indicator for cumulative updating of capacity data | KAPKZ | CHAR | 1 |